Difference between revisions of "CreateProject/OldProject/hydrology/en"
From Kalypso
BhawaniRegmi (Talk | contribs) (→Import Old Projects) |
|||
Line 18: | Line 18: | ||
Following steps are carried out depending on the needs: | Following steps are carried out depending on the needs: | ||
* [[Zusammenführen von Szenarien/Altprojekt/hydrology/de|Merging scenarios]] | * [[Zusammenführen von Szenarien/Altprojekt/hydrology/de|Merging scenarios]] | ||
− | * [[Wiederherstellen der Hydrotopeingangsdaten/Altprojekt/hydrology/ | + | * [[Wiederherstellen der Hydrotopeingangsdaten/Altprojekt/hydrology/en|Restoring the Hydrotope input data]] |
[[Category:Hydrology/en]] | [[Category:Hydrology/en]] | ||
{{Languages|ProjekteAnlegen/Old Project/hydrology}} | {{Languages|ProjekteAnlegen/Old Project/hydrology}} |
Revision as of 14:53, 9 January 2017
Import Old Projects
When importing from old projects see ("Old Project Import") the following points must be considered:
After the conversion of the model, it creates a copy of the project. This, the original project is provided with a version number, and saved as a copy in workspace. |
Due to the larger changes in the data structure, only old projects of the versions of 12.11 and 13.12 can be converted automatically. For older project data, a manual processing, for example the time series mapping may be necessary before the model conversion can take place. In these cases, a manual adjustment in the created KalypsoHydrology model must be done. After a new start the import-wizard of “old projects” can be used. |
Due to the fundamentally different approaches of the new version of Kalypso regarding the structure of the project, scenarios and simulations all data cannot be transferred automatically. Further steps must be performed manually by the user See below. |
Manual Steps
After processing the “old project import” and merging the scenarios, further steps may be required to adapt old data.
Following steps are carried out depending on the needs:
Language: | English |
---|